Sports Venues
Projects
Trocadero at Hamer Hall, Melbourne
INSTALLER: Concrete Resurfacing Systems – www.polishedconcretemelbourne.com.au/
BUILDER: Liquid Lines – www.liquidlines.com.au
ARCHITECT: Allan Powell Architects – www.allanpowell.com.au
PROJECT ADDRESS: Under Hamer Hall, Southbank
With outstanding views of the city, and located under Hamer Hall, a 2,661 seat concert hall, the largest venue in the Arts Centre complex, used for orchestra and contemporary music performances the Trocadero bar and brasserie needed a flooring product to handle a few issues which would come up. Concrete Resurfacing Systems, an accredited PANDOMO® contractor supplied the PANDOMO® TerrazzoMicro, a thin topping terrazzo flooring surface to handle the many pre and post theatre patrons who are ushered through the Hamer Hall foyer into Trocadero to enjoy dinner, a drink or both.
The acoustic requirements of the project meant that pouring and grinding a concrete slab was not feasible, as the 70mm thickness did not meet the requirements. PANDOMO® can be installed at 11mm thickness, or on an unbonded screed of 45mm thickness to provide a thinner and efficient solution to traditional terrazzo flooring.
Being a bar and food serving area, stain resistance was critical in ensuring that the floor remained stain resistant.
Concrete Resurfacing Systems worked with Liquid Lines to ensure the most suitable sealer was employed to provide piece of mind in the area of stain resistance. ARDEX can work with you on your project to ensure that the most suitable sealer is specified relating to your flooring performance requirements.
As the project required large pieces of black granite to be embedded in the flooring, the PANDOMO® TerrazzoMicro’s ability to self- level and flow, meant the finish was able to be easily installed around the large pieces of black granite, which was adhered to the floor.
More projects in Sports Venues
-
Quang Ninh Stadium – Vietnam
Quang Ninh Stadium – Vietnam
-
Box Hill Pool Refurbishment
ARDEX waterproofing and tiling systems used in Box Hill pool refurbishment.
-
Water Playground – Elizabeth Quay, Perth
Complete ARDEX system chosen as part of Elizabeth Quay Development
-
Trocadero at Hamer Hall, Melbourne
Concert hall venue requires resilient flooring surface
-
The Pool of Reflection, Sydney
Complete ARDEX system used for restoration works at Hyde Park memorial
-
Opera House Western Foyer, Sydney
ARDEX adhesive, grout and primer used at Sydney Opera House
-
St Barnabas Church, Sydney
Rebuild of 150 year old church utilises ARDEX Flooring system
-
Springs Day Spa & Fitness Centre, Noosa
Top performing ARDEX materials chosen for large scale upgrade
-
Lightning Ridge Olympic Pool
ARDEX tiling system specified for pool complex renovation
-
RACV Royal Pines Golf Resort, Gold Coast
An ARDEX TPO membrane was used to cover a roof area of 600 square metres
-
Cumberland Resort Lorne
ARDEX TPO membrane has been used to repair seriously degraded roofing
-
Q1 Surfers Paradise, Brisbane
ARDEX tile adhesives, soundproofing requirements, grouts and floor leveling were used in this residential tower
-
The Vibe Hotel, Canberra
5000 sq. metres of ARDEX tile adhesive was used for The Vibe Hotel