Application:
Begin the injection at the point of highest resistance to ensure good penetration. Start from the lowest point on a vertical crack and the narrowest area on a horizontal surface.
The packers shall be removed within 24 hours and the holes shall be patched. If necessary, remove the excess cured grout that flowed out from the crack using a grinder.
Color : Light brown
Packaging
Packing size : 20ltr per set